Sub Assembly test - Doors


Door test equipment

The control is performed by connecting the door to the testing equipment.
The sequence of the procedures, necessary to perform the check, is defined by the operator in an interactive way, by means of the display of the door testing equipment.
Customers :

return --->>
return

1
Testing equipment
2 Testing equipment (control panel)
view to top